This is the first year of a new ten-year paving program funded by a property tax levy.
The 2024 Street Improvement Program - Paving, includes the asphalt milling and resurfacing of the 3 miles of local streets including incidental curb and sidewalk replacement.
Streets include
Scott Dr. (Coldspring Dr. to Hawthorne Ave.)
Whittier Dr. N. (Coldspring Dr. to Tarhe School.)
Marvel Dr. (Coldspring Dr. to Hawthorne Ave.)
Hawthorne Ave. (End to Whittier Dr.)
Coldspring Dr. (End to Cul-De-Sac)
Lexington Dr. (Independence Blvd. to End)
Valley Forge Dr. (Independence Blvd. to End)
Breed Hill Ct. (Cul-De-Sac to Lexington Dr.)
Saratoga Ct. (Cul-De-Sac to Lexington Dr.)
Bunker Hill Ct. (Valley Forge Dr. to Cul-De-Sac)
Yorktown Ct. (Valley Forge Dr. Dr. to Cul-De-Sac)
Ludwig Ct. (Hawk St. to Sheridan Dr.)
Hawk St. (Cul-De-Sac to End)
Beverly Hill Dr. (Hawk St. to Sheridan Dr.)
Rose Way. (Cul-De-Sac to Beverly Hills Dr.)
Alternates include
Schorrway Dr. (N. Memorial Dr. to Whittier Dr. S.)
Scenic Dr. (Hillcrest Dr. to Whittier Dr S.)
Nelson Rd.